top of page
Project details

Location: Gunung Putri, West Java

Owner: PT. Vaksindo Satwa Nusantara (Japfa group)

Year Completed: 2021

Scope of Work: Construction of infrastructure, structural, civil, architectural, and MEP (mechanical, electrical, and plumbing) works for buildings.

Vaksindo Vaccine Plant 1

This state-of-the-art vaccine manufacturing facility, dedicated to producing inactivated vaccine vaccines, was constructed in just 18 months.

Despite the tight deadline due to urgent production needs, PT Anantagraha Jaya Mandiri meticulously built the facility to meet the stringent standards required for pharmaceutical manufacturing.

Our comprehensive scope of work encompassed planning, design, and construction of the vaccine manufacturing plant, the laboratory building, R&D building, the BSL (Bio Safety Level) 3 laboratory, and the complex's mosque.

We ensured that every phase was executed with precision, and through close collaboration with all stakeholders, we achieved an incredible result, delivering a facility that stands as a benchmark in the vaccine production industry in Indonesia.
bottom of page